Equipo de inspección de pozos

Well monitoring equipment for environmental professionals — locking well plugs, well caps, vapor extraction fittings, groundwater bailers, and monitoring well manholes. The hardware that gets written into remediation plans. Call (866) 514-3684 for project pricing.

Filtro
Ordenar por:
Todos los productos, Cherne

Tapón de derivación de hierro de 12" de Cherne, 2,6 PSI, 1" de derivación

The Cherne 12" Iron Grip Bypass Plug (part #268-128) is the largest Iron Grip in the Cherne line — a 28 lb cast iron mechanical test plug with 1" NPT...
$ 419.91
Todos los productos, Cherne

Cherne® 18" Gripper® Plug 3/4" con Bypass

The Cherne 18" T-Handle Gripper with Bypass (part #272-998) is the largest mechanical T-Handle Gripper in the Cherne line — a 30 lb heavy-duty aluminum plug with 3/4" NPT male...
$ 948.26
2" PVC female threaded well flat (FE22F) - product photo 2" PVC female threaded well flat (FE22F) - alternate angle
Todos los productos, Equipos de supervisión de pozos

2" PVC hembra roscada bien plana

The Koby 2" PVC female threaded well flat (FE22F) is a flat-bottom end cap for 2" monitoring well casing. ASTM F-480 2tpi threads. PVC construction — no metallic contamination. Made...
$ 4.13
1.25" Torquer Locking Well Vapor Extraction Plug SCH 40 (T1.25VE)
Todos los productos, Koby Environmental, Inc

1.25" Torquer Locking Well Vapor Extraction Plug SCH 40

The Koby 1.25" Torquer Vapor Extraction Plug (T1.25VE) enables vapor and groundwater sampling through a vented port without removing the plug — preserving well integrity and preventing cross-contamination. Internal expansion...
$ 40.80
Cherne PVC 2" Test-Kap Mechanical Plug (270733) - product photo Cherne PVC 2" Test-Kap Mechanical Plug (270733) - alternate angle
Todos los productos, Cherne

Cherne PVC 2" Test-Kap Tapón Mecánico

The Cherne 2" PVC Test-Kap (part #270-733) is a mechanical test plug designed specifically for PVC DWV pipe testing. The Test-Kap slides over the outside of 2" Schedule 40 PVC...
$ 5.88
Todos los productos, Cherne

Tapón Cherne® de 10" con mango en T y derivación de 3/4

The Cherne 10" T-Handle Gripper with Bypass (part #272-965) is a heavy-duty aluminum mechanical test plug with 3/4" NPT male bypass for 10" underground pipe. Rated for 10 PSI /...
$ 454.67

Equipment for Every Stage of the Monitoring Well Lifecycle

Whether you’re installing a new monitoring well network, conducting Phase II ESA sampling, or maintaining a long-term remediation site, the hardware you use determines data quality. Cross-contaminated samples, tampered wells, and failed seals aren’t just operational headaches — they’re regulatory liability.

We supply environmental consultants, remediation contractors, and water utilities with the well security and sampling equipment they need to keep sites compliant and data defensible.

Shop by Application

Well Security & Sealing

Locking well plugs (Torquer, FlushLock, J-Plug, H-Plug) seal the well from inside the casing. Locking well caps (Grip-N-Lock) fit over the exterior and are faster for routine sampling access. Both accept padlocks for chain-of-custody documentation.

Vapor & Gas Monitoring

Torquer vapor extraction plugs and Ex-Cap fittings allow controlled gas sampling and vapor recovery while maintaining a secure seal. These are specified in landfill gas monitoring programs, soil vapor extraction systems, and Phase II ESAs requiring VOC screening.

Groundwater Sampling

Groundwater bailers for grab sampling in monitoring wells. Disposable polyethylene and PVC bailers eliminate cross-contamination between wells. Permanent PVC bailers for dedicated single-well programs. Available individually or in cases of 24.

Ordering for Multi-Well Projects

Most of our well monitoring customers order for 20–200+ well sites. Call (866) 514-3684 to get volume pricing, confirm casing compatibility, and coordinate mixed-size shipments. We ship same-day on in-stock items ordered before 1pm CT.

PREGUNTAS FRECUENTES

What’s the difference between a well plug and a well cap?

A plug seals from inside the pipe casing using an expansion gasket. A cap fits over the outside of the pipe. Plugs create a flush or below-grade seal; caps extend above the casing and are quicker to remove for sampling access.

What equipment do I need for Phase II ESA monitoring wells?

At minimum: locking well plugs or caps (for well security between sampling events), groundwater bailers (for grab samples), and if VOC screening is required, vapor extraction plugs. We can help you spec the full list — call (866) 514-3684.

Do you supply for projects across multiple states?

Yes. We ship nationwide and regularly supply multi-site remediation projects. One order can include mixed sizes and product types shipped to a single location or split across project sites.