}}
How to Pressure Test a Sewer Line: Plug Selection and Safety Guide

The inspector's coming at 8 AM. You've got 200 feet of new 6-inch PVC to test before final backfill. The crew's waiting. Whether your spec calls for a low-pressure air test or a hydrostatic test, you need the right plugs seated correctly and a procedure that passes the first time....

By EDP Team Leer más
Recién añadido a su lista de deseos:
Mi lista de deseos
Acabas de añadir este producto al carrito: